How to choose a kitchen or bathroom renovator: four trades, one contract

The bathroom is the smallest room in the house and one of the dearest to redo, because every trade has to work in it, in the right order, around water. When a wet-area renovation fails, the culprit is often the layer you cannot see: the waterproofing membrane.

Who must be licensed

NSW. "Kitchen, bathroom and laundry renovation" is its own licence category under "other building work", needed when the job is over A$5,000. Waterproofing and wall and floor tiling are separate trade categories. Plumbing and electrical need licences at any price.

Victoria. Registration with the Building and Plumbing Commission is required over A$10,000, and at any value where trades are combined on one job, according to Consumer Affairs Victoria. A bathroom renovation is the textbook combined job. Plumbers must be registered or licensed, and electricians licensed by Energy Safe Victoria.

Queensland. A QBCC licence is needed over A$3,300, and plumbing and drainage at any value.

In every state, ask this exact question: "Which licensed person is doing the waterproofing, and will I get a certificate for it?" A membrane applied by the tiler's apprentice on a Friday afternoon is how showers end up leaking into hallways.

Deposits for cabinetry

Kitchens are mostly built in a factory before anything happens at your place, and the deposit rules allow for that.

StateStandard capOff-site work exception
Queensland10% from A$3,301 to A$19,999, 5% at A$20,000 or moreUp to 20% where more than half the value is built off site, such as bespoke kitchen cabinetry
WA6.5% on contracts from A$7,500 to A$500,000Up to 20% for off-site cabinetry making up more than half the contract
NSW10%None stated on the contracts page
Victoria10% under A$20,000, 5% at A$20,000 or moreNone stated on the deposits page

Sources: QBCC, WA, NSW, Victoria.

A showroom asking for 50% to "put the kitchen into production" is outside every one of those numbers.

What a fair quote contains

  • Demolition and rubbish removal.
  • Plumbing: rough-in, fit-off, any relocation of waste pipes (the expensive bit).
  • Electrical: circuits, exhaust fan, heated towel rail, lighting, and the certificate.
  • Waterproofing: product, areas covered, who applies it, certificate.
  • Tiling: square metres, tile allowance per square metre, layout, grout type.
  • Cabinetry and benchtops: materials, hardware brand, drawings attached.
  • Fixtures: who supplies them, and exact models.
  • "PC" and provisional sums listed, with what happens if they are exceeded.
  • Duration, with the number of days you will be without a shower or kitchen.

Allowances are where the price moves

A quote with a tile allowance of A$40 a square metre, when you have chosen an A$110 tile, is not a cheaper quote. Ask each renovator to price your actual selections, or at least to use the same allowances.

NSW's guidance on choosing a builder flags provisional cost items for the same reason: they vary with site conditions. Ask for a worst-case figure.

Paperwork at the end

Collect the waterproofing certificate, the plumbing compliance certificate (in Victoria, for work of A$750 or more), the electrical certificate, appliance warranties and the final invoice. In Victoria you should get a Certificate of Electrical Safety within 30 days for non-prescribed work.

Quick questions

Can one tradesperson do the whole bathroom?

Only if they hold, or directly engage holders of, each licence the job needs. Ask for every licence number, not just the head contractor's.

The shower leaks a year later. Who is responsible?

The business you contracted with, even if a subcontractor did the waterproofing. Write to them with photos and ask for an inspection. Building work also carries statutory warranties in some states.

Sources

Opened and read in November 2026. Follow the links for the current wording.

General information for Australian consumers, not legal advice. Spotted an error? Tell us.

Keep reading

All of by service